§ 10-4-9. CULVERTS AND BRIDGES.
Latest version.
Cross street culverts and bridges shall be designed to the criteria in the following table:
Culvert and Bridge Design Criteria
| |
| | |
Local and minor collector | Runnoff to be conveyed by culvert or bridge under road with no flow overtoppng the road | Runnoff to be conveyed by culvert or bridge and by flow over the road wit a maximum 6-inch flow depth over the road. | Runnoff to be conveyed by culvert or bridge and by flow over the road with a maximum 12-inch flow dept over the road. |
Collector, arterial and parkway | Runnoff to be conveyed by culvert or bridge under road with no flow overtopping the road. | Runnoff to be conveyed by culvert and by flow over the road with maximum 6-inch flow depth over the road Minimum freeboard for bridges is 2 feet. |
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');