§ 10-6-4. CONSTRUCTION WITHIN PUBLIC RIGHT-OF-WAY.
Latest version.
- (A) Trenching and pavement replacement. For sewer line extensions and sewer taps in existing pavement areas within public ROW, the pavement replacement shall be per Apache Junction Standard Detail AJ-200M, Type “S.”(B) Manholes. All manholes constructed in the pavement areas within public ROW shall have the tops of the frames and covers at surface grade and a concrete collar constructed per M.A.G. Standard Detail 422.(Ord. passed - - )